Adjustable steel shoring prop, also known as adjustable steel prop or steel scaffolding prop, is a vertical support structure made of steel tubes or segments that are telescopic and height-adjustable. They are versatile and can be used for different applications, including as support columns for concrete walls or slabs, as temporary shoring for floor joists or beams, and as reinforcement for damaged brick or stone walls.
• Light-duty props: Primarily used for light construction work and can support loads of up to around 20 kN. These types of shoring props are made of lighter materials and are typically used for small-scale projects or where the construction work is not too intensive.
• Heavy-duty props: Designed to support much heavier loads and can bear up to around 60 kN. These scaffolding props are made of heavier materials Q235 steel and are capable of supporting larger and more complex structures.
Both light-duty and heavy-duty props can be easily adjusted to provide the required support, making them an ideal choice for a wide range of construction projects.
Name |
Steel props |
|
Material |
Q235 |
|
Diameter of inner tube |
40mm,48mm,etc |
|
Diameter of outer tube |
48mm,56mm,60mm,etc |
|
Wall thiickness |
1.6mm,1.7mm,1.8mm,2mm etc |
|
Adjustable length |
Heavy duty |
1800-3200mm,2100-3400mm,2200-3900mm,2200-4000mm,3000-5000mm,3500-4000mm etc |
Light Duty |
1600-3000mm,1800-3500mm,2000-3500mm etc |
|
Base Plant |
120*120*4mm/4.5mm/5mm,150*150*6mm |
|
Shape of base plate |
Flower or square |
|
Surface |
painted,hot dip galvanized,pre-galvanized,electrol galvanized |
|
Type |
With hands cuo or open thread |
|
Package |
In bundle or in bulk |
Sizes/dimensions we can supply:
Heavy Duty Prop |
|||
MIN |
MAX |
Inner tube |
Outer tube |
1.8m |
3.2m |
48*2.0mm |
60*2.0mm |
2.1m |
3.4m |
48*2.0mm |
60*2.0mm |
2.2m |
4.0m |
48*2.0mm |
60*2.0mm |
2.4m |
3.9m |
48*2.0mm |
60*2.0mm |
3.5m |
4.0m |
48*2.0mm |
60*2.0mm |
3.0m |
5.0m |
48*2.0mm |
60*2.0mm |
Light Duty Prop |
|||
MIN |
MAX |
Inner tube |
Outer tube |
1.6m |
3.0m |
40*2.0mm |
48*2.0mm |
48*2.0mm |
56*2.0mm |
||
1.8m |
3.5m |
40*2.0mm |
48*2.0mm |
48*2.0mm |
56*2.0mm |
||
2.0m |
3.5m |
40*2.0mm |
48*2.0mm |
48*2.0mm |
56*2.0mm |
Adjustable steel shoring props are important structural elements that are used in construction sites to support temporary formwork, falsework, and scaffolding when performing concrete placement, demolition, or renovation works. These adjustable scaffolding props are versatile, durable, and easy to use, and they provide excellent load-bearing capacity and stability to ensure the safety of workers and structures.
1. Load-Bearing Capacity: Adjustable steel shoring props are designed to support heavy loads, making them ideal for use in construction sites where the weight of construction materials and machinery can be significant.
2. Versatility: They are highly versatile and can be used for different applications, including supporting formwork, falsework, and scaffolding.
3. Durability: Adjustable building props are made of high-quality steel that is resistant to corrosion and other elements that can cause structural damage.
4. Easy to Use: They are simple to install and adjust, making them an ideal choice for construction site workers who need a reliable and efficient support structure that can be set up quickly.
5. Safety: Adjustable steel props from Fushi Wood are designed to provide excellent stability, which makes them a safe and reliable support system for temporary structures.
Detailed Images:
1) Professional welding engineers with more than 10 years welding experience for high quality welding
2) We have our own steel pipe production lines, which provide raw material for steel props. Thus can control the quality and delivery time better.
3) QC team to do the inspection for sizes, thickness, welding part and surface during in-line production and final packing
4) 15 years experience in Steel Pipe and Scaffolding field, and rcih cooperation experience with heavy buyers
5) Fast delivery
Package:in bundles or in bulks
Delivery Time:Normally 18-20days after T/T or L/C or D/P
Our Services:
①Over 10 years professional experience in producing Steel Pipes and Scaffolding
②High quality and service
③Rich experience in doing business with international customers
④Fast Delivery